, Malaysia

Is the solar energy boom in Malaysia sustainable?

More auctions are needed to sustain growth, analysts say.

Analysts from BMI Research believe that whilst the sector’s short-term prospects remain sunny, more government auctions are needed to sustain the industry’s growth.

For instance, the country’s second competitive bidding round for large-scale solar photovoltaic (PV) projects was significantly oversubscribed. The target aggregate capacity for the February 2017 auction was 460 MW; however, it received over 1.6GW of submissions. This later culminated in a total of 563MW of capacity being awarded in December 2017.

“Recent developments within the Malaysian solar power sector attest to the fact that the renewables sector is becoming an attractive investment destination for renewables developers. The continuation of auctions in the country and the successful commissioning of the projects contracted presents a sizeable upside risk to our forecasts,” the report said.

Thankfully, Malaysia’s well-established solar manufacturing sector ensures that there is a reliable and low-cost supply chain for solar project developers.

“As a result, the project pipeline, notably for biomass and solar projects, is strengthening accordingly. The government’s commitment to the domestic renewables sector has strengthened of late, and a number of regulations have been put in place to encourage investment into the sector, including feed-in tariffs, tax incentives and, more recently, renewable energy auctions,” the report noted.

“We expect robust growth in non-hydro renewables capacity over the coming decade, with annual average growth rates of 8.5% between 2018 and 2027. This will result in non-hydro renewables capacity totalling 3.3GW by 2027,” it added.
 

PT Jawa Satu Power mulai mengoperasikan pembangkit listrik tenaga LNG sebesar 1.760 MW di Indonesia

Pembangkit ini dapat memproduksi listrik untuk 4,3 juta rumah tangga.

Barito Wind Energy mengakuisisi mayoritas saham di PT UPC Sidrap Bayu Energi

Perusahaan ini akan memegang saham sebesar 99,99% di perusahaan tersebut.

Grup NEFIN bekerja ekstra keras dalam mengejar proyek-proyeknya

CEO Glenn Lim menjelaskan bagaimana keterlambatan berubah menjadi hal baik karena perusahaan bertujuan mencapai kapasitas 667 MW pada 2026.

Summit Power International menyediakan dukungan LNG yang vital untuk Bangladesh

Tanpa pasokan listrik cross-border, LNG diperlukan oleh negara yang menghadapi kendala geografis untuk menerapkan sumber energi terbarukan.

JERA, mitra unit PT PLN untuk pengembangan rantai nilai LNG

MOU juga mencakup studi kemungkinan konversi ke hidrogen, rantai nilai amonia.

VOX POP: Bagaimana teknologi vehicle-to-grid dapat meningkatkan transisi energi?

Teknologi vehicle-to-grid (V2G) dipandang sebagai inovasi revolusioner menuju ketahanan jaringan listrik dan peningkatan transisi energi yang kokoh.

IDCTA: Partisipasi global dapat meningkatkan penjualan kredit karbon Indonesia

Pasar karbon Indonesia yang baru dibuka memiliki sebanyak 71,95% kredit karbon yang belum terjual pada akhir 2023.

Bagaimana Asia Tenggara dapat mencapai potensi biogasnya

Kawasan ini hanya memiliki sekitar satu gigawatt kapasitas dengan Thailand, Indonesia, dan Malaysia memimpin dalam hal produksi.