, India

NHPC pursuing statutory clearances for Teesta Hydroelectirc project

NHPC is now trying to garner all statutory clearances for Teesta stage-IV hydroelectric project to receive approval from the Public Investment Board.

 

The Ministry of Power made it clear that PIB approval will only be forthcoming after these clearances are in place.

The cumulative expenditure incurred on the project up to June 2011 stands at Rs 35.22 crore, with a budget expenditure of Rs 79.30 crore for the ongoing fiscal. The total cost of the project, at June 2009 price levels, has been estimated at Rs 3,594.74 crore.

The 520 MW HEP, located in Sikkim, is a run-of-river scheme proposed to utilize the hydel potential of the river Teesta. The project envisages the construction of a 45 m high concrete dam across the Teesta river, a surface power house on the left bank of the river, with four turbine units of 40 MW capacity, each, and four pressure shafts of 7 m diameter. The project is expected to afford an annual energy generation of 720 million units, assuming 90% performance.

PT Jawa Satu Power mulai mengoperasikan pembangkit listrik tenaga LNG sebesar 1.760 MW di Indonesia

Pembangkit ini dapat memproduksi listrik untuk 4,3 juta rumah tangga.

Barito Wind Energy mengakuisisi mayoritas saham di PT UPC Sidrap Bayu Energi

Perusahaan ini akan memegang saham sebesar 99,99% di perusahaan tersebut.

Grup NEFIN bekerja ekstra keras dalam mengejar proyek-proyeknya

CEO Glenn Lim menjelaskan bagaimana keterlambatan berubah menjadi hal baik karena perusahaan bertujuan mencapai kapasitas 667 MW pada 2026.

Summit Power International menyediakan dukungan LNG yang vital untuk Bangladesh

Tanpa pasokan listrik cross-border, LNG diperlukan oleh negara yang menghadapi kendala geografis untuk menerapkan sumber energi terbarukan.

JERA, mitra unit PT PLN untuk pengembangan rantai nilai LNG

MOU juga mencakup studi kemungkinan konversi ke hidrogen, rantai nilai amonia.

VOX POP: Bagaimana teknologi vehicle-to-grid dapat meningkatkan transisi energi?

Teknologi vehicle-to-grid (V2G) dipandang sebagai inovasi revolusioner menuju ketahanan jaringan listrik dan peningkatan transisi energi yang kokoh.

IDCTA: Partisipasi global dapat meningkatkan penjualan kredit karbon Indonesia

Pasar karbon Indonesia yang baru dibuka memiliki sebanyak 71,95% kredit karbon yang belum terjual pada akhir 2023.

Bagaimana Asia Tenggara dapat mencapai potensi biogasnya

Kawasan ini hanya memiliki sekitar satu gigawatt kapasitas dengan Thailand, Indonesia, dan Malaysia memimpin dalam hal produksi.