, India
858 views

Greenko Group to develop India’s largest pumped storage project

The project will be completed within 30 months.

Energy company Greenko Group officially inaugurated the construction of its massive 1,440-megawatt (MW) pumped hydro storage project in Madhya Pradesh, the largest in India. 

In a statement, Greenko Group said the hydro storage project, located in the Khemla block of Neemuch, is capable of managing a storage capacity of 7.5 hours and being expanded to 1,920 MW, with six hours storage to keep nearly 11 gigawatt-hours (GWh) daily. 

It can hold more than 7,000 MW of renewable capacity when integrated with other utilities, upon completion.

Chief Minister of Madhya Pradesh Shivraj Singh Chouhan takes part in the official unveiling, culminating in the laying of the foundation stone.

ALSO READ: NTPC unit to supply RE to Greenko’s green ammonia plant

The project will have an overall investment of around $1.4b (INR115b) over the next three years, providing 4,800 job opportunities during the construction, and 200 jobs after completion. 

An additional amount of around $180,200 (INR15m) will be injected into local community projects for indirect jobs including small infrastructure contracts and hiring of vehicles, amongst others.

Greenko’s large-scale hydro storage serves as an open-loop project, connecting to the existing Gandhi Sagar Reservoir and to a proposed upper reservoir. The project will also include a 35-metre-tall Asphalt Face Rockfill Embankment Dam.

The storage project in Madhya Pradesh is part of the Greenko Group’s initiative to develop storage cloud platforms capable of 100 gigawatt-hours.

$1 = INR83.21

Follow the link for more news on

PT Jawa Satu Power mulai mengoperasikan pembangkit listrik tenaga LNG sebesar 1.760 MW di Indonesia

Pembangkit ini dapat memproduksi listrik untuk 4,3 juta rumah tangga.

Barito Wind Energy mengakuisisi mayoritas saham di PT UPC Sidrap Bayu Energi

Perusahaan ini akan memegang saham sebesar 99,99% di perusahaan tersebut.

Grup NEFIN bekerja ekstra keras dalam mengejar proyek-proyeknya

CEO Glenn Lim menjelaskan bagaimana keterlambatan berubah menjadi hal baik karena perusahaan bertujuan mencapai kapasitas 667 MW pada 2026.

Summit Power International menyediakan dukungan LNG yang vital untuk Bangladesh

Tanpa pasokan listrik cross-border, LNG diperlukan oleh negara yang menghadapi kendala geografis untuk menerapkan sumber energi terbarukan.

JERA, mitra unit PT PLN untuk pengembangan rantai nilai LNG

MOU juga mencakup studi kemungkinan konversi ke hidrogen, rantai nilai amonia.

VOX POP: Bagaimana teknologi vehicle-to-grid dapat meningkatkan transisi energi?

Teknologi vehicle-to-grid (V2G) dipandang sebagai inovasi revolusioner menuju ketahanan jaringan listrik dan peningkatan transisi energi yang kokoh.

IDCTA: Partisipasi global dapat meningkatkan penjualan kredit karbon Indonesia

Pasar karbon Indonesia yang baru dibuka memiliki sebanyak 71,95% kredit karbon yang belum terjual pada akhir 2023.

Bagaimana Asia Tenggara dapat mencapai potensi biogasnya

Kawasan ini hanya memiliki sekitar satu gigawatt kapasitas dengan Thailand, Indonesia, dan Malaysia memimpin dalam hal produksi.