, China

Power demand in China edges up by 2.5% y/y in 2M15

But generation remained unimpressive.

National power demand in China rose by 2.5% y-y in 2M15, vs 4.5% y-y in 2M14, mainly owing to flattish industrial demand growth at 1.5% y-y amid domestic economic slowdown.

According to a research note from Nomura, power generation, accordingly, also remained weak at 1.9% y-y in 2M15, vs 5.5% in 2M14.

The largest gains in power output were in Xinjiang, Chongqing, Zhejiang, Fujian, and Guizhou, where Datang has the highest exposure.

Here's more from Nomura:

National average plant utilisation fell by 5.8% y-y in 2M15, mainly dragged down by thermal utilisation due to continuous strong hydropower output and low domestic demand. New power capacity addition was 13.4GW in 2M15, accounting for 1.0% of end-2014 capacity.

In line with our view, seaborne coal price continued its weak trend in 2M15, declining to CNY465/tonne on 16 Mar 2015, the lowest level since Aug 2007. With the supply/demand situation unchanged, we reiterate our view that coal price will remain at a relatively low level in 2015F.

In general, given limited positive catalysts ahead (eg, with only interest rate cuts and decent dividend yield offering support) and several downside factors (eg, on-grid tariff cuts, pressure on utilisation given the emission targets to be met pursuant to the 12th FYP, domestic economic slowdown, and increasing environmental capex resulting from stricter emissions control), we turn more cautious on the China IPP sector, with the recent driving force of power industry reform being only a long-term catalyst.

In addition, we believe that the company’s decent hydropower exposure makes it less sensitive than its peers to coal-fired on-grid tariff cuts, while offering potential upside from hydropower tariff hikes. CPID also has plans for asset injection, which should support its ambitious capacity addition plans.
 

PT Jawa Satu Power mulai mengoperasikan pembangkit listrik tenaga LNG sebesar 1.760 MW di Indonesia

Pembangkit ini dapat memproduksi listrik untuk 4,3 juta rumah tangga.

Barito Wind Energy mengakuisisi mayoritas saham di PT UPC Sidrap Bayu Energi

Perusahaan ini akan memegang saham sebesar 99,99% di perusahaan tersebut.

Grup NEFIN bekerja ekstra keras dalam mengejar proyek-proyeknya

CEO Glenn Lim menjelaskan bagaimana keterlambatan berubah menjadi hal baik karena perusahaan bertujuan mencapai kapasitas 667 MW pada 2026.

Summit Power International menyediakan dukungan LNG yang vital untuk Bangladesh

Tanpa pasokan listrik cross-border, LNG diperlukan oleh negara yang menghadapi kendala geografis untuk menerapkan sumber energi terbarukan.

JERA, mitra unit PT PLN untuk pengembangan rantai nilai LNG

MOU juga mencakup studi kemungkinan konversi ke hidrogen, rantai nilai amonia.

VOX POP: Bagaimana teknologi vehicle-to-grid dapat meningkatkan transisi energi?

Teknologi vehicle-to-grid (V2G) dipandang sebagai inovasi revolusioner menuju ketahanan jaringan listrik dan peningkatan transisi energi yang kokoh.

IDCTA: Partisipasi global dapat meningkatkan penjualan kredit karbon Indonesia

Pasar karbon Indonesia yang baru dibuka memiliki sebanyak 71,95% kredit karbon yang belum terjual pada akhir 2023.

Bagaimana Asia Tenggara dapat mencapai potensi biogasnya

Kawasan ini hanya memiliki sekitar satu gigawatt kapasitas dengan Thailand, Indonesia, dan Malaysia memimpin dalam hal produksi.