Published:

Aboitiz Power eyes 380MW hydropower complex to boost supply in province
It will be in Ifugao.
Aboitiz Power Corp.'s (AP-HOLD) unit, SN Aboitiz Power-Ifugao (SNAPI), is set to build a 380MW hydropower complex.
According to a research note from Maybank Kim Eng, it will be in Lagawe, Ifugao to provide additional power supply to the Luzon grid.
The project is composed of three hydropower plants namely the Alimit Hydroelectric with 120MW target capacity, Olilicon Hydroelectric with 10MW target capacity, and Alimit Pumped-Storage Hydroelectric with 250MW.