
Yellow River power stations exceed 20TWh in production
The total electricity production of various cascade hydropower stations in the Yellow River Basin exceeded 20TWh this year.
The hyudropower stations include Banduo, Longyangxia and Laxiwa,
In the first half of this year, the average water consumption for power generation of CPI Huanghe Company was 5.33m3/KWh, down by 4.7% year-on-year and achieving notable economic benefits in general.
Meanwhile, the overall house supply of cascade hydropower stations in Yellow River Basin was 0.69%, down by 0.07 percentage points compared to the same period of last year, and supplying 12GWh more electricity to the grid.