, APAC
144 views

How soon should the world retire coal plants to meet climate goals

GEM estimated coal retirement globally needs to be almost five times faster.  

Coal retirement across the globe needs to speed up by four and a half times to attain 2040 climate goals, the Global Energy Monitor (GEM) reported. 

In its ninth annual survey of the coal plant pipeline, GEM found that coal power capacity retirements reached 26 gigawatts (GW) in 2022, whilst another 25GW received an announced close-by date of 2030. 

Planned coal-fired capacity in developing countries, excluding China, declined by 23GW, offset by China’s planned capacity which increased by 126GW. 

“To stay on track, all existing coal plants must be retired by 2030 in the world’s richest countries, and by 2040 everywhere, and there is no room for any new coal plants to come online,” the report read.  

“Whilst newly proposed coal power capacity has declined significantly, the world is not retiring existing coal plants fast enough.” 

Read more: ADB to study early coal retirement in Kazakhstan

GEM added that phasing out operating coal power by 2040 would require an average of 117GW of retirements annually. This is four and a half times more than the capacity retired last year. 

An average of 60GW must come offline in OECD countries each year to meet their 2030 coal phaseout deadline, and for non-OECD countries, 91 GW each year for their 2040 deadline. Accounting for coal plants under construction and in consideration (537 GW) would require even steeper cuts.

 

Follow the link for more news on

PT Jawa Satu Power mulai mengoperasikan pembangkit listrik tenaga LNG sebesar 1.760 MW di Indonesia

Pembangkit ini dapat memproduksi listrik untuk 4,3 juta rumah tangga.

Barito Wind Energy mengakuisisi mayoritas saham di PT UPC Sidrap Bayu Energi

Perusahaan ini akan memegang saham sebesar 99,99% di perusahaan tersebut.

Grup NEFIN bekerja ekstra keras dalam mengejar proyek-proyeknya

CEO Glenn Lim menjelaskan bagaimana keterlambatan berubah menjadi hal baik karena perusahaan bertujuan mencapai kapasitas 667 MW pada 2026.

Summit Power International menyediakan dukungan LNG yang vital untuk Bangladesh

Tanpa pasokan listrik cross-border, LNG diperlukan oleh negara yang menghadapi kendala geografis untuk menerapkan sumber energi terbarukan.

JERA, mitra unit PT PLN untuk pengembangan rantai nilai LNG

MOU juga mencakup studi kemungkinan konversi ke hidrogen, rantai nilai amonia.

VOX POP: Bagaimana teknologi vehicle-to-grid dapat meningkatkan transisi energi?

Teknologi vehicle-to-grid (V2G) dipandang sebagai inovasi revolusioner menuju ketahanan jaringan listrik dan peningkatan transisi energi yang kokoh.

IDCTA: Partisipasi global dapat meningkatkan penjualan kredit karbon Indonesia

Pasar karbon Indonesia yang baru dibuka memiliki sebanyak 71,95% kredit karbon yang belum terjual pada akhir 2023.

Bagaimana Asia Tenggara dapat mencapai potensi biogasnya

Kawasan ini hanya memiliki sekitar satu gigawatt kapasitas dengan Thailand, Indonesia, dan Malaysia memimpin dalam hal produksi.